TL-20 bonds 5mm of natural stone to an aluminum honeycomb core with a full thermal break — engineered for exterior cladding, rainscreens and curtain walls where solid stone is too heavy to hang.
TL-20 buildup. The thermal break layer is what separates TL-20 from interior honeycomb panels — it handles the temperature differential across an exterior assembly.
Panel weight drives the whole assembly: anchor sizing, substructure, crane time, and how much stone a facade can carry at all. These are typical finished weights per square foot.
A stone block is sliced to 5mm and bonded to an aluminum honeycomb core. The honeycomb carries the load the stone thickness used to carry, which is why the panel can lose most of its mass without losing its span.
Between the two sits the thermal break — a proprietary layer that absorbs the differential movement between stone and aluminum as an exterior wall heats and cools. Without it, a bonded panel in direct sun works itself apart over time.
Panels arrive finished and ready to hang, with anchors pre-attached if the assembly calls for them.
Stone face on an open-joint rainscreen, hung on a substructure sized for a fraction of the dead load. Suits retrofit work where the existing structure was never designed to carry stone.
Stone spandrel and infill panels prepared for specific curtain wall systems, so the stone arrives ready for the glazing contractor rather than needing site fabrication.
Full-height cladding on towers, hospitality exteriors and entry surrounds, with bonded returns handling reveals and corners as single pieces.
TL-20 and the honeycomb series on facades, curtain walls and rainscreens. Each of these started as a block selection.
A custom natural texture on the deepest black granite available, carried across facade, balcony caps and a 2-inch solid stone base. Blocks were selected in India so every element came from the same material, with bonded corners throughout for sharp edges where the facade meets the curtain wall.
The stone had to match a neighbouring 1902 building carrying a century of patina. After 22 quarry swatches, the match required special extraction from a quarry in Portugal — and the whole production still finished in under 12 weeks.
Grooves 3/8 inch deep at 1-inch intervals, balanced across every panel so the horizontal striations read as continuous around the building rather than restarting at each joint. Behind the stone sits a continuous-insulation curtain wall.
Simple in appearance, engineered with a group that included NASA. On 11 November at 11:11am, sunlight passes through openings in the five columns — one for each branch of service — and lights the Great Seal in the mosaic below.
An existing exterior refaced without demolition. The curtain wall was completed in four weeks using blocks already in inventory, then sealed with a hydrophobic coating to keep the bright white finish clean.
TL-20 alongside the adjacent panel lines, so you can see where it sits. For interior-only work, AL-20 does the same job without the thermal break.
| Code | Series | Buildup | Weight | Install | Use |
|---|---|---|---|---|---|
| TL-20 | Thermal | 5mm stone + 20mm honeycomb, full thermal break | 3–4 lbs/ft² | Mechanical or adhesive | Exterior and interior; no substrate required |
| AL-20 | AL | 5mm stone + 20mm aluminum honeycomb | 3–5 lbs/ft² | Mechanical or adhesive | Interior vertical, furniture |
| FT-20 | Backlit | 5mm stone + 20mm translucent fiberglass honeycomb | 3–4 lbs/ft² | Mechanical | Backlit vertical installations |
| SB-08 | SlimSlabs® | 8mm stone + 1mm fiberglass | 6–7 lbs/ft² | Adhesive | Vertical or horizontal over substrate |
| PS-05 | PolySlabs® | 5mm stone + 5mm polymer composite | ~6 lbs/ft² | Adhesive | Interior vertical over substrate |
Tell us the assembly and the stone you have in mind. We'll come back with what's available, panel sizing and lead time.